Chorley

Filters:

* (eg Temporary Traffic Lights, Lane Closures etc)
RoadnameBeechwood Road
Work Status About To Start
Restrictions Give and take
Description Remedial reinstatement to correct defect
Dates 26/01/2018 - 30/01/2018
Operator Virgin Media
Location Jnc Bolton Rd To Junction Redwood Drive

RoadnameBlackburn New Road
Work Status In Progress
Restrictions Stop / Go boards
Description Side dress and slurry seal 424m2
Dates 01/01/2018 - 08/01/2018
Operator Lancashire County Council
Location A674 Blackburn New Road Whittle-Le-Woods

RoadnameBlackburn New Road
Work Status In Progress
Restrictions Stop / Go boards
Description Side dress / weed kill / patch / slurry seal 1834m2
Dates 01/01/2018 - 12/01/2018
Operator Lancashire County Council
Location A674 Blackburn New Road From Victoria Street North To Whins Lane

RoadnameBlackburn Road
Work Status In Progress
Restrictions Two-way signals
Description Installing vx's at 395 and 399 blackburn road, higher wheelton
Dates 19/12/2017 - 21/12/2017
Operator Lancashire County Council
Location At 395 And 399

RoadnameBlackburn Road
Work Status About To Start
Restrictions Two-way signals
Description After tm survey 2 way lights to cover engineers working at side of road to provide new fibre optic cable to customer at 347 blackburn road higher wheelton chorley pr6 8hp off peak working 09:30 - 15:00 lights manually controlled
Dates 22/01/2018 - 24/01/2018
Operator BT
Location 347 Blackburn Road At Fishwick Lane Pr6 8Fa

RoadnameBlackburn Road
Work Status About To Start
Restrictions Two-way signals
Description Maintenance dig to provide ducting in footway for provision of service
Dates 22/01/2018 - 24/01/2018
Operator BT
Location 347 Blackburn Road Higher Wheelton Chorley Pr6

RoadnameBlue Stone Lane
Work Status In Progress
Restrictions Two-way signals
Description Alter and relay non standard gas service 6.5m from main in carriageway
Dates 12/12/2017 - 18/12/2017
Operator National Grid Gas Plc
Location Outside Two Acres Blue Stone Lane

RoadnameBlue Stone Lane
Work Status In Progress
Restrictions Two-way signals
Description Install new 25mm long sided water connection, followed by permanent reinstatement.
Dates 16/01/2018 - 19/01/2018
Operator United Utilities Water Limited
Location Outside And Opposite Two Acres

RoadnameBolton Road
Work Status In Progress
Restrictions Stop / Go boards
Description Footway slurry sealing
Dates 24/11/2017 - 28/11/2017
Operator Lancashire County Council
Location From Os Hare & Hounds Ph To The Junction With Roddlesworth Lane

RoadnameBolton Road
Work Status In Progress
Restrictions Stop / Go boards
Description Side dress and slurry seal 1185m2
Dates 01/01/2018 - 12/01/2018
Operator Lancashire County Council
Location Bolton Rd From Roddlesworth Lane To Dole Lane

RoadnameCarr House Lane
Work Status In Progress
Restrictions Two-way signals
Description Side dressing and small amount of footway repairs
Dates 23/11/2017 - 29/11/2017
Operator Lancashire County Council
Location Carr House Lane, Bretherton From The A59 Roundabout To The War Memorial

RoadnameChapel Lane
Work Status In Progress
Restrictions Priority working
Description Patc kerds and retread 1671m2 of footway
Dates 01/01/2018 - 19/01/2018
Operator Lancashire County Council
Location Hoghton Lane To Railway Tracks

RoadnameChapel Lane
Work Status About To Start
Restrictions Give and take
Description Install external water meter and boundary box at depth of under 1.5 metres with minimum dig with permanent reinstatement
Dates 21/01/2018 - 24/01/2018
Operator United Utilities Water Limited
Location Footway Outside Number 61 Left Of Gate

RoadnameClayton Brook Road
Work Status About To Start
Restrictions Two-way signals
Description Non excavation works - 2 way lights 50m barrier around a cherry picker to access a telecoms mast for repair/maintance
Dates 23/01/2018 - 23/01/2018
Operator T-Mobile (UK) Limited
Location Between Carr Meadow And Croft Meadow

RoadnameDean Head Lane
Work Status In Progress
Restrictions Road Closure
Description End connection main laying / reinforcement 90mm to 63mm pe, aprox 500m excavation
Dates 15/01/2018 - 23/02/2018
Operator United Utilities Water Limited
Location Fron Wilcocks Farm To Morris Barn

RoadnameHillside Crescent
Work Status In Progress
Restrictions Give and take
Description Immediate works to end unplanned interruption of supply provided by uu, to repair leaking main by hand dig in footway
Dates 13/01/2018 - 19/01/2018
Operator United Utilities Water Limited
Location Junction Of Mill Lane

RoadnameHoghton Lane
Work Status In Progress
Restrictions Stop / Go boards
Description Footway slurry sealing
Dates 28/11/2017 - 30/11/2017
Operator Lancashire County Council
Location Hoghton Lane From The Two Junctions With Station Road

RoadnameHoghton Lane
Work Status In Progress
Restrictions Stop / Go boards
Description Side dress and slurry seal 1271m2
Dates 01/01/2018 - 15/01/2018
Operator Lancashire County Council
Location Hoghton Ln From No.21 East Heading West To 70M South Of The Old Vicara

RoadnameHoghton Lane
Work Status In Progress
Restrictions Stop / Go boards
Description Side dress & slurry seal 1367m2 footway both sides of the loop.
Dates 01/01/2018 - 15/01/2018
Operator Lancashire County Council
Location Hoghton Lane From The West Jcn To The East Jcn Of Station Rd Loop, Bo

RoadnameLighthurst Lane
Work Status In Progress
Restrictions Stop / Go boards
Description Footway scheme
Dates 23/10/2017 - 01/12/2017
Operator Lancashire County Council
Location Lighthurst Lane From Its Junction With Carr Lane To Sandgate

RoadnameNew Street
Work Status In Progress
Restrictions Two-way signals
Description Short sided disconnection of old lead supply and replacement with new connection.
Dates 17/01/2018 - 19/01/2018
Operator United Utilities Water Limited
Location Outside Number 40

RoadnameOrchard Drive
Work Status In Progress
Restrictions Give and take
Description Excavate, install and connect lv poc cable to new site in footway and carriageway tm give and take (signing and guarding full chap 8) start date for orchard drive 27/11 & start date for royton drive is 04/12/2017.
Dates 27/11/2017 - 15/12/2017
Operator Lancashire County Council
Location Orchard Drive, Royton Drive Whittle Le Woods Pr6 7Jz

RoadnamePark Road
Work Status In Progress
Restrictions Stop / Go boards
Description Retread 2904m2 of footway and construct mobility croosings as required.
Dates 01/01/2018 - 20/01/2018
Operator Lancashire County Council
Location Park Rd From Market St To Castle House Lane

RoadnamePreston Road
Work Status In Progress
Restrictions Stop / Go boards
Description Footway slurry sealing
Dates 22/11/2017 - 28/11/2017
Operator Lancashire County Council
Location From The Junction With Mill Lane To Junction With Old Hall Lane

RoadnamePreston Road
Work Status In Progress
Restrictions Stop / Go boards
Description Side dress and slurry seal footway
Dates 01/01/2018 - 12/01/2018
Operator Lancashire County Council
Location Preston Rd From Old Hall Ln To Back Ln

RoadnamePreston Road
Work Status In Progress
Restrictions Stop / Go boards
Description Side dress and slurry seal 1035m2
Dates 01/01/2018 - 05/01/2018
Operator Lancashire County Council
Location A49 Preston Road Charnock Richard

RoadnamePreston Road
Work Status In Progress
Restrictions Stop / Go boards
Description Patch kerd and slurry seal (3373m2)
Dates 01/01/2018 - 15/01/2018
Operator Lancashire County Council
Location A49 Preston Road From The Stables To Mill Lane

RoadnamePreston Road
Work Status About To Start
Restrictions Two-way signals
Description Open cut excavation required to repair existing assets that is causing a potential hazard, on behalf of united utilities in footway
Dates 22/01/2018 - 24/01/2018
Operator United Utilities Water Limited
Location Outside Charnock Brow Farm

RoadnamePrivate Road
Work Status In Progress
Restrictions Road Closure
Description Masonry repairs to existing abutments& windwalls. 23:00 - 08:00
Dates 27/11/2017 - 30/11/2017
Operator Network Rail -Promoters National
Location In The Area Of The Railway Bridge

RoadnameRed House Lane
Work Status In Progress
Restrictions Stop / Go boards
Description Retread footway and patch kerbs
Dates 01/01/2018 - 15/01/2018
Operator Lancashire County Council
Location Red House Lane From The Green To Out Side No52

RoadnameRed House Lane
Work Status In Progress
Restrictions Multi-way signals
Description Trace, then excavate to repair gas escape and reinstate where possible
Dates 13/01/2018 - 23/01/2018
Operator National Grid Gas Plc
Location Side Of 237 On Red House Lane In Carriageway

RoadnameRichmond Road
Work Status In Progress
Restrictions Stop / Go boards
Description Retread footway 288m2
Dates 01/01/2018 - 19/01/2018
Operator Lancashire County Council
Location Richmond Rd From Balmoral Rd To Conway Rd

RoadnameRichmond Road
Work Status In Progress
Restrictions Priority working
Description Retread footway 286m2
Dates 01/01/2018 - 12/01/2018
Operator Lancashire County Council
Location Richmond Road From Balmoral Rd To Conway Rd

RoadnameRiley Green Switch Road
Work Status In Progress
Restrictions Stop / Go boards
Description Footway slurry sealing
Dates 30/11/2017 - 04/12/2017
Operator Lancashire County Council
Location From 175 Metres North West Of Sandy Lane To Os 21 Riley Green Switch Road

RoadnameRose Hill
Work Status About To Start
Restrictions Stop / Go boards
Description Excavate joint bays with approximately 70 metres of track in footway and carriageway to install ducting and cable for new connections (2 road crossings)
Dates 25/01/2018 - 07/02/2018
Operator Electicity North West
Location Rear Of 90 Wigan Road, To Outside 8-9 Rose Hill, To Outside Numbers 7 And 28.

RoadnameRoyton Drive
Work Status About To Start
Restrictions Give and take
Description Excavate, install and connect lv poc cable to new site in footway and carriageway tm give and take (signing and guarding full chap 8) start date for orchard drive 27/11 & start date for royton drive is 04/12/2017.
Dates 22/01/2018 - 26/01/2018
Operator Lancashire County Council
Location Junction Of Orchard Drive

RoadnameRunshaw Lane
Work Status About To Start
Restrictions Two-way signals
Description Open cut excavation required to repair existing assets that is causing a potential hazard, on behalf of united utilities in verge.
Dates 24/01/2018 - 26/01/2018
Operator United Utilities Water Limited
Location Opposite Runshaw Hall

RoadnameSheep House Lane
Work Status In Progress
Restrictions Stop / Go boards
Description Roadmarkings, verge marker posts, excavation to explore and rectify drainage run-off
Dates 05/12/2017 - 18/12/2017
Operator Lancashire County Council
Location From Lcc Boundary To A Point 1670M In A Westerly Direction

RoadnameStation Road
Work Status About To Start
Restrictions Two-way signals
Description Old lead pipe removal and replacement with new connection
Dates 25/01/2018 - 25/01/2018
Operator United Utilities Water Limited
Location Outside 50

RoadnameThe Green
Work Status In Progress
Restrictions Multi-way signals
Description Trace, then excavate to repair gas escape and reinstate where possible
Dates 10/01/2018 - 25/01/2018
Operator National Grid Gas Plc
Location In Footpath Outside Number 237A

RoadnameUlnes Walton Lane
Work Status About To Start
Restrictions Two-way signals
Description Croston - 446944 - poling works - excavate for new bt openreach pole (s) or to replace existing bt openreach pole (s) in verge to facilitate overhead spine cabling works.
Dates 22/01/2018 - 22/01/2018
Operator BT
Location From Opposite Of Lostock Brow Farm To Approx 68M North West On Ulnes Walton Lane

RoadnameWatkin Road
Work Status About To Start
Restrictions Give and take
Description Lay new domestic gas service 4m from main in carriageway
Dates 23/01/2018 - 25/01/2018
Operator National Grid Gas Plc
Location Main Located In The Carriageway Outside 35 Watkin Road

RoadnameWesthoughton Road
Work Status In Progress
Restrictions Lane closure
Description Drainage works due to flooding on dual carriageway
Dates 16/01/2018 - 18/01/2018
Operator Lancashire County Council
Location At Start Of Dual Carriageway

RoadnameWigan Lane
Work Status In Progress
Restrictions Two-way signals
Description Recover 1 existing pole
Dates 19/01/2018 - 23/01/2018
Operator BT
Location Wigan Lane Approx 281M South Of Entrance To Timber Yard, Wigan Lane

RoadnameWigan Road
Work Status In Progress
Restrictions Two-way signals
Description S278 works infilling old entrances on footpath & resurface. Remedial works. Off peak 0930 to 1500
Dates 07/12/2017 - 08/12/2017
Operator Lancashire County Council
Location Eccleston Homes

RoadnameWigan Road
Work Status In Progress
Restrictions Stop / Go boards
Description Pre-surface dressing patching. This permit replaces paa351664 which was incorrectly stopped on 11 december 2017. Directly linked to section from boundary to dawson lane (paa351665).
Dates 13/12/2017 - 15/12/2017
Operator Lancashire County Council
Location Moss Lane To South Ribble Boundary

RoadnameWigan Road
Work Status In Progress
Restrictions Stop / Go boards
Description Side dress / weed kill / patch kerbing and retread 1754m2
Dates 01/01/2018 - 22/01/2018
Operator Lancashire County Council
Location Wigan Rd From Lydiate Ln To Shady Ln.

RoadnameWigan Road
Work Status In Progress
Restrictions Multi-way signals
Description Immediate works to end unplanned interruption of supply or service provided by uu. Open cut excavation required to repair leak on water main in carriageway.
Dates 19/01/2018 - 25/01/2018
Operator United Utilities Water Limited
Location Outside 194