Chorley

Filters:

* (eg Temporary Traffic Lights, Lane Closures etc)
RoadnameBack Lane
Work Status In Progress
Restrictions Stop / Go boards
Description Repair suspected drainage defect - causing flooding
Dates 10/08/2017 - 14/08/2017
Operator Lancashire County Council
Location At The Junction Of Eyes Lane, Opposite Leet House

RoadnameBretherton Road
Work Status In Progress
Restrictions Two-way signals
Description Installation of new footway
Dates 03/08/2017 - 13/10/2017
Operator Lancashire County Council
Location From The Junction With Moor Road To Lostock Bridge

RoadnameBrookwood Way
Work Status In Progress
Restrictions Give and take
Description Works as per quote dated 03/05/17 for trinity ce methodist primary school
Dates 26/06/2017 - 27/09/2017
Operator Lancashire County Council
Location On School Grounds

RoadnameChorley Road
Work Status In Progress
Restrictions Two-way signals
Description Excavate and resurface footways
Dates 02/08/2017 - 22/09/2017
Operator Lancashire County Council
Location From Withnell Fold To 0Llerton Lane

RoadnameCleveland Street
Work Status In Progress
Restrictions Lane closure
Description Repaving of and upgrading of footways and street lighting and power points.
Dates 10/04/2017 - 28/07/2017
Operator Lancashire County Council
Location From Fazakerley Street To High Street

RoadnameDawbers Lane
Work Status In Progress
Restrictions Two-way signals
Description Lay new gas main 3m in footway and 7.5m in road
Dates 19/09/2017 - 26/09/2017
Operator Fulcrum Pipelines Limited
Location Outside Former Euxton Mill, Dawbers Lane

RoadnameDickens Road
Work Status In Progress
Restrictions Give and take
Description New sewer connection in c/w tm to be give and take
Dates 14/08/2017 - 25/08/2017
Operator Lancashire County Council
Location Opp Number 2 Dickens Road, Coppull

RoadnameDickens Road
Work Status In Progress
Restrictions Give and take
Description New sewer connection in c/w tm to be give and take
Dates 14/08/2017 - 08/09/2017
Operator Lancashire County Council
Location Opp Number 2 Dickens Road, Coppull

RoadnameDuke Street
Work Status In Progress
Restrictions Road Closure
Description Carriageway inlay, 40mm.
Dates 16/08/2017 - 19/08/2017
Operator Lancashire County Council
Location Bolton Street To Pall Mall

RoadnameEaves Lane
Work Status In Progress
Restrictions Stop / Go boards
Description Application of micro surface dressing
Dates 20/09/2017 - 29/09/2017
Operator Lancashire County Council
Location Harpers Lane To Froom Street

RoadnameFazakerley Street
Work Status In Progress
Restrictions Road Closure
Description Repaving of and upgrading of footways and street lighting and power points.
Dates 10/04/2017 - 28/07/2017
Operator Lancashire County Council
Location Peter St Adj Chorley Little Theatre To Cleveland Street

RoadnameHallgate
Work Status About To Start
Restrictions Give and take
Description Interim to perm propose in footway
Dates 22/09/2017 - 22/09/2017
Operator Virgin Media
Location From Opp Entrance To The Barons Rest, Rod Crossing To C/O 38 Harewood

RoadnameHarewood
Work Status About To Start
Restrictions Give and take
Description Interim to perm propose in footway
Dates 22/09/2017 - 22/09/2017
Operator Virgin Media
Location From Jct Of Hall Gate To F/W Opp 38 And Across To O/S 60

RoadnameHorrobin Lane
Work Status In Progress
Restrictions Road Closure
Description Micro surface dressing. This will require 3 days work on site but a larger time window is required due to the highly weather sensitive nature of the work.
Dates 10/07/2017 - 11/08/2017
Operator Lancashire County Council
Location New Road To Rivington Embankment

RoadnameHorrobin Lane
Work Status In Progress
Restrictions Road Closure
Description Rms are undertaking micro asphalt surface treatment over two days.
Dates 20/09/2017 - 21/09/2017
Operator Lancashire County Council
Location New Road To Rivington Embankment

RoadnameLancaster Lane
Work Status About To Start
Restrictions Multi-way signals
Description To repair traffic signal loops at the junction of below
Dates 23/09/2017 - 23/09/2017
Operator Lancashire County Council
Location Wigan Road Jct. Leyland Way And Lancaster Lane

RoadnameLibrary Street
Work Status In Progress
Restrictions Two-way signals
Description Immediate works to end unplanned interruption of supply provided by uu, to repair leaking main by machine digging in carriageway
Dates 19/09/2017 - 25/09/2017
Operator United Utilities Water Limited
Location 50 M From Junction With Gillibrand Walks

RoadnameMaplewood Close
Work Status About To Start
Restrictions Give and take
Description To carry out remedial reinstatement
Dates 22/09/2017 - 25/09/2017
Operator Virgin Media
Location O/S 3-5, O/S 5, O/S 16

RoadnameMayfield Road
Work Status In Progress
Restrictions Road Closure
Description Drainage dig down and repair
Dates 24/07/2017 - 26/07/2017
Operator Lancashire County Council
Location Mayfield Rd At Its Junction With Stump Lane (Adj To 35 Stump Lane)

RoadnameMeadow Lane
Work Status In Progress
Restrictions Stop / Go boards
Description Reconstruct footway starting at little hanging bridge to approx the sewage works.
Dates 15/06/2017 - 04/08/2017
Operator Lancashire County Council
Location Meadow Lane From Little Hanging Bridge To Sewage Works Footway.

RoadnameMoss Lane
Work Status In Progress
Restrictions Give and take
Description Excavate lay & connect gas, electric and water mains and services to site
Dates 18/09/2017 - 29/09/2017
Operator Lancashire County Council
Location Adjacent To Leatherlands Farm Moss Lane

RoadnameMoulden Brow
Work Status In Progress
Restrictions Road Closure
Description Surface dressing - the process should take 1-2 days but the process is affected by problems with weather and plant so a 1 month period is required.
Dates 03/07/2017 - 03/08/2017
Operator Lancashire County Council
Location Riley Green Switch Road To Boundary

RoadnamePreston Road
Work Status In Progress
Restrictions Multi-way signals
Description Immediate works to end unplanned interruption of supply provided by uu, to repair leaking main by machine digging in carriageway
Dates 19/09/2017 - 25/09/2017
Operator United Utilities Water Limited
Location Outside 122

RoadnameRailway Street
Work Status In Progress
Restrictions Road Closure
Description Demolition of building and construction of new building in it place adjacent on the highways. H&s reasons
Dates 09/01/2017 - 09/01/2018
Operator Lancashire County Council
Location O/S Bus Station To Jct Albert Street

RoadnameRedwood Drive
Work Status About To Start
Restrictions Give and take
Description Remedial reinstatement required
Dates 22/09/2017 - 25/09/2017
Operator Virgin Media
Location O/S 9, O/S 15, O/S 19, O/S 47, O/S 48, O/S 64, O/S 67, O/S 77

RoadnameRosewood Close
Work Status About To Start
Restrictions Give and take
Description Remedial reinstatement to correct default
Dates 22/09/2017 - 25/09/2017
Operator Virgin Media
Location O/S 3

RoadnameRufford Road
Work Status In Progress
Restrictions Two-way signals
Description Rufford - 401614 - permanent reinstatement - interim to permanent - in cw
Dates 21/09/2017 - 22/09/2017
Operator BT
Location Opp To Os Lapwing House Rufford Road On Rufford Road

RoadnameSmithy Lane
Work Status In Progress
Restrictions Two-way signals
Description Lay new domestic service 6m from main in carriageway
Dates 14/09/2017 - 20/09/2017
Operator National Grid Gas Plc
Location Outside 1 The Willows Farm

RoadnameSpendmore Lane
Work Status In Progress
Restrictions Multi-way signals
Description Immediate works to end unplanned interruption of supply provided by uu, to repair leaking main by machine digigng in carriageway
Dates 18/09/2017 - 22/09/2017
Operator United Utilities Water Limited
Location Junction Off South Road

RoadnameSpendmore Lane
Work Status In Progress
Restrictions Multi-way signals
Description Signal head - permit for information only - no fee to be charged' - works relate to permit ref: (520001733598-0020)
Dates 19/09/2017 - 25/09/2017
Operator United Utilities Water Limited
Location Junction Off Preston Road

RoadnameStandish Street
Work Status About To Start
Restrictions Give and take
Description Interim to permanent reinstatement in carriageway
Dates 24/09/2017 - 24/09/2017
Operator United Utilities Water Limited
Location Haslam Printers

RoadnameStation Road
Work Status In Progress
Restrictions Two-way signals
Description Renew lead supply at depth of less than 1.5 metres with permanent reinstatement (long side
Dates 19/09/2017 - 21/09/2017
Operator United Utilities Water Limited
Location Outside And Opposite 48

RoadnameStump Lane
Work Status About To Start
Restrictions Road Closure
Description Raising parapets 22:00 - 06:00 each night. We have two men on site to marshall pedestrians through the closure . Diversion route attached
Dates 23/09/2017 - 28/09/2017
Operator Network Rail -Promoters National
Location At The Railway Bridge (Road Over Rail Bridge)

RoadnameThe Elms
Work Status In Progress
Restrictions Give and take
Description Gas,water & electrical connection to new site - standard chapter 8 traffic management
Dates 30/06/2017 - 23/07/2017
Operator Lancashire County Council
Location The Elms, Clayton Le Woods

RoadnameThe Hillocks
Work Status In Progress
Restrictions Road Closure
Description Road closure to allow for major bridge works
Dates 21/08/2017 - 28/10/2017
Operator Lancashire County Council
Location Croston Town Bridge

RoadnameTownley Street
Work Status In Progress
Restrictions Give and take
Description Excavate and connect 14 gas and electric service from existing mains
Dates 21/09/2017 - 04/10/2017
Operator Lancashire County Council
Location Townley Street

RoadnameWigan Road
Work Status In Progress
Restrictions Two-way signals
Description Abandon 1.6m x 6" cl. 2m x 5", 3.5m x 7" pe. Lay 8.8m x 180mmpeopencut.all services on route.
Dates 18/09/2017 - 29/09/2017
Operator National Grid Gas Plc
Location To The Side And Rear Of 26 Harrock Road

RoadnameWood Lane
Work Status In Progress
Restrictions Two-way signals
Description Install 25mm new water connection x2
Dates 19/09/2017 - 21/09/2017
Operator United Utilities Water Limited
Location Benson House

RoadnameWorthy Street
Work Status In Progress
Restrictions Road Closure
Description Permit for tm purposes only - main work to manhole frame& cover is on brooke street (hz102-520001693845-0020)
Dates 16/09/2017 - 16/09/2017
Operator Lancashire County Council
Location Junction With Brooke Street