Fylde

Filters:

* (eg Temporary Traffic Lights, Lane Closures etc)
RoadnameAlbany Road
Work Status About To Start
Restrictions Two-way signals
Description Gang to carry out reinstatement works due to consequential damage in carriageway
Dates 27/01/2018 - 28/01/2018
Operator United Utilities Water Limited
Location Outside 70

RoadnameBank Lane
Work Status In Progress
Restrictions Priority working
Description Freckleton - 403577 - 403437 - build new carraigeway 4 joint chamber and lay 2m of duct in verge to dp wp 2 : lay approx 280m new duct in verge& carriageway including building proposed chambers in verge.
Dates 10/01/2018 - 19/01/2018
Operator BT
Location Outside Parles Cottage To Outside Lowood On Bank Lane On Bank Lane

RoadnameBenbow Close
Work Status In Progress
Restrictions Give and take
Description Carry out all necessary repairs to gully and connection
Dates 20/11/2017 - 22/11/2017
Operator Lancashire County Council
Location Outside No 3

RoadnameBryning Hall Lane
Work Status In Progress
Restrictions Multi-way signals
Description Signal head - permit for information only - no fee to be charged - works relate to permit reference hz101 520001785863-0010
Dates 19/01/2018 - 19/01/2018
Operator United Utilities Water Limited
Location At The Junction Of Bryning Lane

RoadnameCarr Lane
Work Status In Progress
Restrictions Multi-way signals
Description Signal head - permit for information only - no fee to be charged - make safe is on preston street (hz102-520001854363-0020)
Dates 18/01/2018 - 02/02/2018
Operator United Utilities Water Limited
Location Junction With Preston Street

RoadnameChurch Road
Work Status In Progress
Restrictions Multi-way signals
Description Traffic signals required to allow construction vehicle to enter/leave site. Both lights will be set permanently to green permanently except for when deliveries are taking place in which case both lights will be turned to red for no more than two minutes.
Dates 05/02/2017 - 05/02/2018
Operator Network Rail -Promoters National
Location Sligtly North Of Wood View Farm Opposite The Track.

RoadnameDeepdale Lane
Work Status In Progress
Restrictions Multi-way signals
Description After tm survey 4 way lights required to cover engineers cabling off peak working 09:30 - 15 :00 week day lights manually controlled see other notice bc005cn2w0000000ibt623tx
Dates 15/01/2018 - 19/01/2018
Operator BT
Location Deepdale Lane At Junction With Lea Lane Pr4 0Rh

RoadnameDowbridge
Work Status In Progress
Restrictions Multi-way signals
Description Signal head - permit for information only - no fee to be charged - make safe is on preston street (hz102- 520001854363-0020)
Dates 18/01/2018 - 02/02/2018
Operator United Utilities Water Limited
Location Junction With Preston Street

RoadnameFairlawn Road
Work Status In Progress
Restrictions Road Closure
Description Construction site access
Dates 11/12/2017 - 24/12/2019
Operator Lancashire County Council
Location Clifton Drive To End Of Fairlawn Road

RoadnameFleetwood Road
Work Status About To Start
Restrictions Two-way signals
Description Gang to rectify defective reinstatement in c/way
Dates 23/01/2018 - 23/01/2018
Operator United Utilities Water Limited
Location 293 Metres From Junction With Roundabout, Kirkham Wesham Bypass

RoadnameHill Farm Road
Work Status In Progress
Restrictions Multi-way signals
Description Open cut excavation required to replace existing damaged fire hydrant frame and cover to prevent circumstances, which might cause damage to people or property. Works required at the request of the regional highways inspector, in carriageway
Dates 19/01/2018 - 19/01/2018
Operator United Utilities Water Limited
Location At The Junction Of Bryning Lane

RoadnameLinnet Lane
Work Status In Progress
Restrictions Give and take
Description Trial hole
Dates 12/01/2018 - 16/01/2018
Operator National Grid Gas Plc
Location Opposite Lytham Cemetary

RoadnamePeel Road
Work Status In Progress
Restrictions Two-way signals
Description Trace, then excavate to repair gas escape and reinstate where possible
Dates 18/01/2018 - 24/01/2018
Operator National Grid Gas Plc
Location In Road At Lamp 4 Peel Road Blackpool

RoadnamePegs Lane
Work Status In Progress
Restrictions Road Closure
Description Excavate on pegs lane to carry out gas operationonthepoorconditionmedium gas main.
Dates 11/01/2018 - 03/04/2018
Operator National Grid Gas Plc
Location Road Closure On Pegs Lane In Connectionwithgasmainsreplacement Pegslane At The Jucntion Of Saltcotes Road.

RoadnamePreston Old Road
Work Status In Progress
Restrictions Two-way signals
Description Excavate and lay new lv cable to supply wain homes development. Gas connection
Dates 15/01/2018 - 02/02/2018
Operator Lancashire County Council
Location 346219, 430449

RoadnamePreston Street
Work Status In Progress
Restrictions Multi-way signals
Description Immediate works to prevent unplanned interruption of service provided by uu - make safe to void in carriageway
Dates 18/01/2018 - 02/02/2018
Operator United Utilities Water Limited
Location Opposite 3 Dowbridge Way / Near Junction With Carr Lane

RoadnameRibby Road
Work Status In Progress
Restrictions Multi-way signals
Description Ashton on ribble 448869 - overlay - lay approx 159m of duct 54/56 in cw,footway to link existing bt boxes to facilitate spine cabling works.
Dates 19/01/2018 - 01/02/2018
Operator BT
Location From O/S 28 To O/S 16 On Ribby Road

RoadnameSaltcotes Road
Work Status In Progress
Restrictions Road Closure
Description Abandon 936.3m x 12" si. Lay 936.3m x 250mm pe unknown. Allservicesonroute.
Dates 08/01/2018 - 29/03/2018
Operator National Grid Gas Plc
Location Junction Of Pegs Lane To Outside Eastham Hall Caravan Park

RoadnameStaining Road
Work Status In Progress
Restrictions Two-way signals
Description Trace, then excavate to repair gas escape and reinstate where possible
Dates 14/01/2018 - 19/01/2018
Operator National Grid Gas Plc
Location Op No 58

RoadnameStation Road
Work Status In Progress
Restrictions Two-way signals
Description Traffic signals required to allow construction vehicle to enter/leave site. Both lights will be set permanently to green permanently except for when deliveries are taking place in which case both lights will be turned to red for no more than two minutes. As part of the phase 3 parapet works it is required to contruct the parapets. Works require closing each lane to allow for the parapets to be built. The worksite will be hoarded off from the general public. 13/01/18 - 26/01/18 22:00-06:00
Dates 31/01/2017 - 02/07/2018
Operator Network Rail -Promoters National
Location At The Railway Bridge