Lancaster

Filters:

* (eg Temporary Traffic Lights, Lane Closures etc)
RoadnameAldcliffe Road
Work Status About To Start
Restrictions Stop / Go boards
Description Felling of very large tree.
Dates 28/03/2017 - 29/03/2017
Operator Lancashire County Council
Location Aldcliffe Road At New Housing Site

RoadnameAlexandra Road
Work Status In Progress
Restrictions Stop / Go boards
Description Laying duct in the f/w,c/w and building boxes
Dates 24/03/2017 - 02/05/2017
Operator Virgin Media
Location From The Junction Of Lancaster Road To Towpath Walk

RoadnameBare Avenue
Work Status In Progress
Restrictions Stop / Go boards
Description Installation of cabinets, swept tees, duct, chambers and subsequent installation of network cabling.
Dates 20/03/2017 - 31/03/2017
Operator Virgin Media
Location Bare Ave, From Junc With Seaborn Road To No 49& From Junc With Seaborn Grove To Junc With Junc With Palmers Grove.

RoadnameBare Lane
Work Status In Progress
Restrictions Stop / Go boards
Description Installation of cabinets, swept tees, duct, chambers and subsequent installation of network cabling
Dates 23/03/2017 - 23/03/2017
Operator Virgin Media
Location O/S No 1 To O/S No 47 Bare Lane.

RoadnameBorwick Road
Work Status In Progress
Restrictions Two-way signals
Description Immediate works to end unplanned interruption of supply provided by uu to repair leaking service by hand digging in verge
Dates 23/03/2017 - 29/03/2017
Operator United Utilities Water Limited
Location Outside Mansergh Farm

RoadnameBroadway
Work Status In Progress
Restrictions Stop / Go boards
Description Trial digs
Dates 24/03/2017 - 10/04/2017
Operator Virgin Media
Location Works On A589 Bridge Above South Road, Broadway

RoadnameCavendish Court
Work Status In Progress
Restrictions Give and take
Description Hest bank - 365785 - interim to permanent - in fw
Dates 21/02/2017 - 22/02/2017
Operator BT
Location O/S 2 Cavendish Court, Bolton- Le- Sands

RoadnameCheapside
Work Status About To Start
Restrictions Give and take
Description Repair work to lancaster pedestrian wayfinding system
Dates 30/03/2017 - 03/04/2017
Operator Lancashire County Council
Location At Junction Penny Street.

RoadnameChestnut Drive
Work Status In Progress
Restrictions Stop / Go boards
Description Installation of cabinets, swept tees, duct, chambers and subsequent installation of network cabling.
Dates 09/03/2017 - 28/03/2017
Operator Virgin Media
Location Junc With Oak Ave To No 25 Chestnut Drive And O/S 24 To O/S No 20 Chestnut Drive.

RoadnameChina Street
Work Status In Progress
Restrictions Lane closure
Description Lancaster - 80 - 378677 -378309 - 10 day aio dslam and power - combined pcp& dslam -all in one street cabinet & power installation. Excavate to lay a bt ducts, lay concrete plinth, stand cab. Excavate to expose low voltage cable for power connection and lay approx 5m duct in fw/cw. Power engineer to carry out inspection prior to jointing. Power jointing team to insert cable and execute jointing works.linked with works on market street
Dates 07/03/2017 - 20/03/2017
Operator BT
Location S/O 58 On China Street

RoadnameChurch Street
Work Status About To Start
Restrictions Two-way signals
Description Kirkby lonsdale - 349731 - kirkby lonsdale spine sub duct and cabling. To rod rope and test, and install approx 206m of sub duct and cable and any associated blockages in existing in cw/fw/verge - spine route to exchange
Dates 30/03/2017 - 12/04/2017
Operator BT
Location From Jnc Of Main Street To Jnc Of Hutton Roof Road On Church Street

RoadnameClifford Avenue
Work Status About To Start
Restrictions Stop / Go boards
Description Installation of cabinets, swept tees, duct, chambers and subsequent installation of network cabling.
Dates 31/03/2017 - 04/04/2017
Operator Virgin Media
Location Junc With St Margarets Road To Junc With Seaborn Road, And O/S No 4 To O/S No 2 Clifford Ave.

RoadnameCoastal Road
Work Status In Progress
Restrictions Stop / Go boards
Description Surface dressing patching
Dates 14/02/2017 - 17/02/2017
Operator Lancashire County Council
Location Shore Lane To 32M South West Of Madison Avenue

RoadnameCoastal Road
Work Status In Progress
Restrictions Two-way signals
Description Laying duct in the f/w, c/w and building boxes
Dates 07/03/2017 - 03/04/2017
Operator Virgin Media
Location Ffrom The Jnct Of Madison Avenue To The Jnct Of Marine Drive

RoadnameCoastal Road
Work Status About To Start
Restrictions Two-way signals
Description Building hp1 cabinet in the f/w
Dates 28/03/2017 - 30/03/2017
Operator Virgin Media
Location O/S Number 63

RoadnameConder Brow
Work Status In Progress
Restrictions Give and take
Description Laying dudct in the f/w
Dates 01/02/2017 - 21/02/2017
Operator Virgin Media
Location From The Junction Of Redmayne Drive To Outside Number One Conder Brow

RoadnameCoulston Road
Work Status In Progress
Restrictions Two-way signals
Description Lay new gas service approx 4m in road. To make reinstatement permanent.
Dates 14/02/2017 - 21/02/2017
Operator Fulcrum Pipelines Limited
Location Outside Number 136. Works On Coulston Road.

RoadnameEden Grove
Work Status In Progress
Restrictions Multi-way signals
Description Carnforth 373844 - traffic management to facilitate bt openreach fibre cabling works - with no excavation.
Dates 18/02/2017 - 21/02/2017
Operator BT
Location At The Junction Of Whin Grove

RoadnameEdenmount Way
Work Status In Progress
Restrictions Give and take
Description Carnforth - 379152 - maintenance excavation - fault ref: lc1rda88 - 30m duct 56 required from serving jf4 opp number 11 to cross road and provide new jm4 o/s 11 then run duct to number 15 at left hand side of property a bt66 - customer out of service
Dates 24/03/2017 - 28/03/2017
Operator BT
Location Opposite Number 11 To Outside 15 Eden Mount

RoadnameEllis Drive
Work Status About To Start
Restrictions Stop / Go boards
Description Installation of cabinets, swept tees, duct, chambers and subsequent installation of network cabling.
Dates 31/03/2017 - 13/04/2017
Operator Virgin Media
Location O/S No 2 To O/S No 36 Ellis Drive& Junc With Bare Lane To O/S No 49 Ellis Drive.

RoadnameElms Drive
Work Status In Progress
Restrictions Stop / Go boards
Description Installation of cabinets, swept tees, duct, chambers and subsequent installation of network cabling.
Dates 23/03/2017 - 12/04/2017
Operator Virgin Media
Location Junc With Bare Lane To Junc With Mount Ave And Outside No. 2 To O/S No 40 Elms Drive.

RoadnameEmesgate Lane
Work Status In Progress
Restrictions Multi-way signals
Description Silverdale - r5 - other - install new aio cabinet (pcp&dslam combined), including mod 6 joint chamber in footway, install 8m 5 way duct in verge, install 10m 5 way duct in carriageway, perform power excavation in footway
Dates 17/03/2017 - 28/03/2017
Operator BT
Location Opposite 42 Emesgate Lane Crossing Carriageway To S/O 2A St Johns Avenue, Silverdale

RoadnameEskrigge Lane
Work Status In Progress
Restrictions Multi-way signals
Description Hornby - 355797 - install and build new aio cabinet (dslam& pcp combined) - install new mod 6 chamber in verge, install 3m of 4 way duct in verge, install 10m of 4 way duct in carriageway
Dates 20/03/2017 - 28/03/2017
Operator BT
Location O/S St Johns Church Across Carriageway To Junction Of Silverhill, On Eskrigge Lane

RoadnameEuston Road
Work Status In Progress
Restrictions Road Closure
Description Pedestrian zone total re construction
Dates 06/02/2017 - 02/06/2017
Operator Lancashire County Council
Location Euston Road Precinct.

RoadnameFall Kirk
Work Status In Progress
Restrictions Multi-way signals
Description Hornby - r6 - r-structure 355797 - overlay - lay approx 2m of duct 54/56 in carriageway to link existing bt boxes to facilitate spine cabling works.
Dates 20/03/2017 - 28/03/2017
Operator BT
Location Opposite Church Bank On Fall Kirk

RoadnameGrange Street
Work Status In Progress
Restrictions Stop / Go boards
Description Installation of cabinets, swept tees, duct, chambers and subsequent installation of network cabling.
Dates 20/03/2017 - 31/03/2017
Operator Virgin Media
Location O/S No 3 Grange Street To No. 31 And O/S No. 48 To O/S No 8.

RoadnameGreen Lane
Work Status In Progress
Restrictions Road Closure
Description Emergancy closure of green lane canal bridge due to vehicle strike levanig it unsafe for use
Dates 26/11/2016 - 28/04/2017
Operator Lancashire County Council
Location Green Lane Canal Bridge

RoadnameGreyhound Bridge Road
Work Status In Progress
Restrictions Lane closure
Description Lane 3 closure on greyhound bridge on friday 3rd march from 19:00 - 4th march 06:00.
Dates 03/03/2017 - 04/03/2017
Operator Lancashire County Council
Location Greyhound Bridge Road, Greyhound Bridge, Lancaster

RoadnameGrosvenor Court
Work Status In Progress
Restrictions Stop / Go boards
Description Laying duct in the f.w,c.w and building boxes
Dates 21/03/2017 - 04/05/2017
Operator Virgin Media
Location From The Junction Of Grosvenor Place

RoadnameGrosvenor Place
Work Status In Progress
Restrictions Stop / Go boards
Description Laying duct in the f/w, c/w and building boxes
Dates 21/03/2017 - 11/05/2017
Operator Virgin Media
Location From The Junction Of Grosvenor Court To The Junction Of Grosvenor Road

RoadnameHall Park
Work Status In Progress
Restrictions Give and take
Description Abandon 99m x 3", 209m x 4" cast iron. Lay 99m x 55mm, 207
Dates 03/03/2017 - 30/03/2017
Operator National Grid Gas Plc
Location 1 - 31, 29 - Corner Of 23(Odds) Including Road Crosssing Opposite 30/32

RoadnameHalsall Drive
Work Status In Progress
Restrictions Stop / Go boards
Description Installation of cabinets, swept tees, duct, chambers and subsequent installation of network cabling.
Dates 20/03/2017 - 29/03/2017
Operator Virgin Media
Location Junc With Oak Ave To O/S No 2 Hallsall Drive And Opp No 3 To Junc With Taylor Grove.

RoadnameHatlex Lane
Work Status In Progress
Restrictions Two-way signals
Description Laying duct in the f/w c/w and building boxes
Dates 01/02/2017 - 07/03/2017
Operator Virgin Media
Location From The Jnct Of Coastal Road To Outside 23

RoadnameHaws Avenue
Work Status In Progress
Restrictions Stop / Go boards
Description Laying duct in the f/w,c.w and building boxes
Dates 21/03/2017 - 26/04/2017
Operator Virgin Media
Location From The Junction Of Grosvenor Road To Outside 14

RoadnameHest Bank Lane
Work Status In Progress
Restrictions Give and take
Description Disconnect old gas service leeding to hest bank hotel. Trench will be approx 1m x 1m e: 346997, n: 466324
Dates 09/03/2017 - 15/03/2017
Operator Fulcrum Pipelines Limited
Location In Carriageway And Footway To Number 2 Hest Bank Lane

RoadnameHest Bank Road
Work Status In Progress
Restrictions Stop / Go boards
Description Installation of cabinets, swept tees, duct, chambers and subsequent installation of network cabling.
Dates 06/02/2017 - 22/02/2017
Operator Virgin Media
Location O/S No 2 To O/S No 12 And O/S 21 To O/S 41 Hest Bank Road.

RoadnameHest Bank Road
Work Status About To Start
Restrictions Stop / Go boards
Description Installation of cabinets, swept tees, duct, chambers and subsequent installation of network cabling
Dates 27/03/2017 - 08/04/2017
Operator Virgin Media
Location O/S 46 Hest Bank Road To O/S No 12& O/S No. 23 To No.3 Junc With Oak Drive.

RoadnameHighfield Road
Work Status In Progress
Restrictions Multi-way signals
Description Laying duct in the f/w, c/w and building boxes
Dates 13/03/2017 - 07/04/2017
Operator Virgin Media
Location From The Jnct Of Kellet Road, To The Jnct Of Windermere Road

RoadnameHill Street
Work Status About To Start
Restrictions Stop / Go boards
Description Laying duct in the f/w, /w and building boxes
Dates 29/03/2017 - 27/04/2017
Operator Virgin Media
Location From Stanley Street To Outside 42

RoadnameHilmore Way
Work Status About To Start
Restrictions Road Closure
Description Gang to replace 2 x manhole frame and cover in carriageway by minimum dig with permanent reinstatement
Dates 02/04/2017 - 02/04/2017
Operator United Utilities Water Limited
Location Between Cycleway And Roundabout On Central Drive (Mhs 0101/0104)

RoadnameHindburn Close
Work Status In Progress
Restrictions Give and take
Description Laying duct in the f/w
Dates 01/02/2017 - 16/02/2017
Operator Virgin Media
Location At The Junction Of Whernside Grove

RoadnameHornby Hall Close
Work Status In Progress
Restrictions Two-way signals
Description Install 110mm duct to connect rural broadband 5mtrs c/w 4mtrs f/w
Dates 24/03/2017 - 28/03/2017
Operator
Location O/S 10 Hornby Hall Close Hornby

RoadnameHoward Mews
Work Status In Progress
Restrictions Stop / Go boards
Description Laying duct in the f/w. C/w and building boxes
Dates 15/02/2017 - 28/03/2017
Operator Virgin Media
Location From The Junction Of Jesson Way

RoadnameHutton Roof Road
Work Status In Progress
Restrictions Two-way signals
Description Kirkby lonsdale - 349731 - blockages and cabling- kirkby lonsdale spine sub duct and cabling. To rod rope and test, and install approx 2530m of sub duct and cable and any associated blockages in existing in f/w,c/w,verg - spine route to exchange
Dates 15/03/2017 - 28/03/2017
Operator BT
Location From O/S Moorlands To Jnc With Church Street On Hutton Roof Road

RoadnameIngleborough Road
Work Status In Progress
Restrictions Give and take
Description Gang to work within manhole to carry out repair to sewer in carriageway way to prevent foul flooding
Dates 16/03/2017 - 30/03/2017
Operator United Utilities Water Limited
Location Outside 38

RoadnameJohnson Close
Work Status In Progress
Restrictions Stop / Go boards
Description Laying duct in f/w, carraigeway and building boxes
Dates 03/02/2017 - 23/02/2017
Operator Virgin Media
Location From The Junction Of Jesson Way

RoadnameKellet Road
Work Status In Progress
Restrictions Multi-way signals
Description Laying duct in the f/w, c/w and building boxes
Dates 27/02/2017 - 07/04/2017
Operator Virgin Media
Location From Carnfroth Bridge To The Jnct Of Kellett Industrial Estate

RoadnameKellet Road
Work Status About To Start
Restrictions Multi-way signals
Description Carnforth - 19 -379910 - overlay - lay approx 6m of duct 54/56 in fw, cw to link existing bt boxes to facilitate spine cabling works.
Dates 28/03/2017 - 10/04/2017
Operator BT
Location Junction With Market Street, North Road And Carnforth Brow On Kellet Road

RoadnameKirkby Lonsdale Road
Work Status In Progress
Restrictions Two-way signals
Description Replace 1 existing pole
Dates 21/02/2017 - 21/02/2017
Operator BT
Location Opp Ent To Newton Hall, Kirkby Lonsdale Road

RoadnameKnowlys Avenue
Work Status About To Start
Restrictions Give and take
Description Lay 12m new gas service of which 4m will be in public to main located infootway
Dates 27/03/2017 - 31/03/2017
Operator National Grid Gas Plc
Location Outside 31

RoadnameLancaster Road
Work Status In Progress
Restrictions Two-way signals
Description Immediate works to end unplanned interruption of supply provided by uu, to repair leaking main by hand digging in footway
Dates 22/02/2017 - 22/02/2017
Operator United Utilities Water Limited
Location Outside Pointer Parrock

RoadnameLancaster Road
Work Status In Progress
Restrictions Two-way signals
Description Immediate works to end unplanned interruption of supply provided by uu, to repair leaking main by hand and machine digging in unmade
Dates 24/03/2017 - 30/03/2017
Operator United Utilities Water Limited
Location 75M From Scarthwaite Bungalow

RoadnameLong Marsh Lane
Work Status In Progress
Restrictions Priority working
Description Abandon 230.6m x 8" ci. All services on route
Dates 21/03/2017 - 04/04/2017
Operator National Grid Gas Plc
Location Opposite The Reeds To Outside Scout Hut And Nursery

RoadnameLongfield Drive
Work Status In Progress
Restrictions Multi-way signals
Description Traffic management purposes only - light head on longfield drive when working on lancaster road
Dates 07/03/2017 - 13/03/2017
Operator Virgin Media
Location At The Junction Of Lancaster Road

RoadnameLow Road
Work Status About To Start
Restrictions Two-way signals
Description Install 110mm duct to connect rural broadband 8mtr c/w 3mtr v 2mtrs f/w
Dates 29/03/2017 - 31/03/2017
Operator
Location Low Road Halton

RoadnameLunesdale View
Work Status In Progress
Restrictions Give and take
Description Long sided disconnection of old lead supply and replacement with new connection
Dates 24/03/2017 - 28/03/2017
Operator United Utilities Water Limited
Location Outside And Opposite 4

RoadnameMain Road
Work Status In Progress
Restrictions Two-way signals
Description Immediate works to prevent unplanned interruption of service provided by uu - gang to dig down and repair sewer in carriageway and footway to prevent foul flooding with permanent reinstatement
Dates 14/02/2017 - 22/02/2017
Operator United Utilities Water Limited
Location Outside Number 20

RoadnameMain Road
Work Status In Progress
Restrictions Multi-way signals
Description Carnforth 373844 - traffic management to facilitate bt openreach fibre cabling works - approx m with no excavation.
Dates 18/02/2017 - 21/02/2017
Operator BT
Location At The Junction Of Whin Grove

RoadnameManor Crescent
Work Status In Progress
Restrictions Stop / Go boards
Description Laying duct in the f/w,c/w and building boxes
Dates 24/03/2017 - 24/04/2017
Operator Virgin Media
Location From The Junction Of Manor Lane

RoadnameManor Lane
Work Status In Progress
Restrictions Multi-way signals
Description Replace leaking fire hydrant at depth of under 1.5 meters by open cut with permanent reinstatement, work to be completed on behalf of united utilities.
Dates 23/03/2017 - 27/03/2017
Operator United Utilities Water Limited
Location Junction Of Manor Rd

RoadnameManor Road
Work Status In Progress
Restrictions Multi-way signals
Description This permit has been raised for the use of multi-way signals which are to be used in connection to works which is being carried out in manor lane under work order hz101 520001639028-0010 to replace a damaged fire hydrant in the carriageway
Dates 23/03/2017 - 27/03/2017
Operator United Utilities Water Limited
Location At The Junction Of Manor Lane

RoadnameMarine Road Central
Work Status In Progress
Restrictions Road Closure
Description Surface dressing patching
Dates 21/02/2017 - 24/02/2017
Operator Lancashire County Council
Location End Of Dualled Section, 140M West Of Northumberland Street To Lord Street

RoadnameMarine Road East
Work Status In Progress
Restrictions Two-way signals
Description Replacement of wall
Dates 16/11/2015 - 01/04/2017
Operator Lancashire County Council
Location Between Marine Road East & Morecambe Promenade Working From Lord Street To Happy Mount Park

RoadnameMarine Road East
Work Status In Progress
Restrictions Stop / Go boards
Description Installation of cabinets, swept tees, duct, chambers and subsequent installation of network cabling
Dates 13/03/2017 - 17/03/2017
Operator Virgin Media
Location O/S 497 Marine Road East To O/S No. 2 Elms Court.

RoadnameMarine Road East
Work Status About To Start
Restrictions Stop / Go boards
Description Installation of cabinets, swept tees, duct, chambers and subsequent installation of network cabling.
Dates 27/03/2017 - 07/04/2017
Operator Virgin Media
Location O/S 490 To O/S 460 Marine Road East.

RoadnameMarket Street
Work Status In Progress
Restrictions Multi-way signals
Description Traffic management purposes only - for works being carried out on north road
Dates 08/03/2017 - 14/03/2017
Operator Virgin Media
Location At The Junction Of Market Street

RoadnameMarket Street
Work Status About To Start
Restrictions Multi-way signals
Description Carnforth - 19 - 379910 - overlay - lay approx 75m of duct 54/56 in fw, cw to link existing bt boxes to facilitate spine cabling works.
Dates 28/03/2017 - 10/04/2017
Operator BT
Location From Junction With North Road And Carnforth Brow, Kellet Road To Approx 75M Nw On Market Street

RoadnameMarket Street
Work Status About To Start
Restrictions Give and take
Description Repair work to lancaster pedestrian wayfinding system
Dates 30/03/2017 - 03/04/2017
Operator Lancashire County Council
Location Near Junction King Street

RoadnameMarsh Lane
Work Status About To Start
Restrictions Two-way signals
Description Access required to underground structure to fully restore service - highway surface will be unaffected. Work being carried out is to existing bt line plant 2 way lights to be used for 2 day - task number lcsph905 temporary traffic management shall be removed as soon as works have been completed.
Dates 27/03/2017 - 28/03/2017
Operator BT
Location Approx 40M S From 1 Marsh Cottages To Opp 11 Marsh Cottages On Marsh Lane

RoadnameMayfield Drive
Work Status In Progress
Restrictions Stop / Go boards
Description Installation of cabinets, swept tees, duct, chambers and subsequent installation of network cabling
Dates 06/02/2017 - 22/02/2017
Operator Virgin Media
Location O/S No 1 To O/S No 16 Mayfield Drive And O/S No 24 To O/S No. 46.

RoadnameMeeting House Lane
Work Status About To Start
Restrictions Give and take
Description Repair work to lancaster s pedestrian wayfinding system
Dates 31/03/2017 - 04/04/2017
Operator Lancashire County Council
Location Junction Westbourne Road

RoadnameMorecambe Road
Work Status About To Start
Restrictions Lane closure
Description Gang to replace manhole frame and cover in carriageway by minimum dig with permanent reinstatement
Dates 02/04/2017 - 02/04/2017
Operator United Utilities Water Limited
Location On Roundabout, Near Junction With Westgate (Mh 2603)

RoadnameNetherbeck
Work Status In Progress
Restrictions Multi-way signals
Description Traffic managment purposes - road crossing taking place on redmayne - light head on netherbeck
Dates 06/03/2017 - 08/03/2017
Operator Virgin Media
Location At The Junction Of Whernside Grove

RoadnameNorth Road
Work Status In Progress
Restrictions Multi-way signals
Description Traffic managment purposes - road crossing taking place on redmayne - light head on north road
Dates 06/03/2017 - 06/03/2017
Operator Virgin Media
Location At The Junction Of Redmayne Drive

RoadnameNorth Road
Work Status In Progress
Restrictions Stop / Go boards
Description Carnforth - 19 - 357270 - 10 day dslam and power - street cabinet& power installation. Excavate to lay approx 10m bt ducts, lay concrete plinth, stand cab. Excavate to expose low voltage cable for power connection and lay approx 4m duct. Power engineer to carry out inspection prior to jointing. Power jointing team to insert cable and execute jointing works. Reinstate, check and clear site.
Dates 13/03/2017 - 24/03/2017
Operator BT
Location Side Of 116, North Road

RoadnameOrchard Close
Work Status In Progress
Restrictions Stop / Go boards
Description Laying duct in the f/w,c,w and building boxes
Dates 24/03/2017 - 13/04/2017
Operator Virgin Media
Location From The Main Road To Outside Number 1

RoadnameOwen Road
Work Status In Progress
Restrictions Road Closure
Description Immediate works to end unplanned interruption of supply provided by uu, to repair leaking valve by handand machine digging in carriageway
Dates 16/03/2017 - 27/03/2017
Operator United Utilities Water Limited
Location Junction Off Torrisholme Road

RoadnameOxcliffe Road
Work Status In Progress
Restrictions Two-way signals
Description Open cut excavation required to replace existing damaged stop tap to prevent circumstances, which might cause damage to people or property. Works required at the request of the regional highways inspector, in footway.
Dates 21/03/2017 - 23/03/2017
Operator United Utilities Water Limited
Location Outside 278

RoadnameOxford Street
Work Status About To Start
Restrictions Stop / Go boards
Description Laying duct in the f/w, c/w and buliding boxes
Dates 29/03/2017 - 05/05/2017
Operator Virgin Media
Location From The Junction Of Lancaster Road

RoadnamePark Lane
Work Status In Progress
Restrictions Road Closure
Description Repair slip on carriagway.
Dates 13/03/2017 - 27/03/2017
Operator Lancashire County Council
Location Park Lane At Second Cattle Grid.

RoadnamePenny Street
Work Status About To Start
Restrictions Give and take
Description Repair work to lancasters pedestrian wayfinding system
Dates 30/03/2017 - 03/04/2017
Operator Lancashire County Council
Location Near Junction Common Garden Street

RoadnamePinfold Lane
Work Status In Progress
Restrictions Give and take
Description Immediate works to end unplanned interruption of supply provided by uu, to repair leaking service by hand and machine digging in footway and carriageway
Dates 15/02/2017 - 22/02/2017
Operator United Utilities Water Limited
Location Outside 46

RoadnameProspect Avenue
Work Status In Progress
Restrictions Stop / Go boards
Description Laying duct on the f.w, c/w and building boxes
Dates 22/03/2017 - 27/04/2017
Operator Virgin Media
Location From The Jnct Of Prospect Drive

RoadnameProspect Drive
Work Status In Progress
Restrictions Stop / Go boards
Description Laying duct in the f/w, c/w and building boxes
Dates 03/03/2017 - 30/03/2017
Operator Virgin Media
Location From The Jnct Of Peacock Lane To The Jnct Of Hest Bank Lane

RoadnameQueen Street
Work Status In Progress
Restrictions Road Closure
Description Footway reconstruction
Dates 20/03/2017 - 09/06/2017
Operator Lancashire County Council
Location From Marine Road Central To One Way System

RoadnameQueens Drive
Work Status In Progress
Restrictions Stop / Go boards
Description Installation of cabinets, swept tees, duct, chambers and subsequent installation of network cabling.
Dates 13/03/2017 - 29/03/2017
Operator Virgin Media
Location Queens Drive Junc With Bare Lane To O/S No. 9 O/S No 10 To O/S No 4.

RoadnameQuernmore Road
Work Status In Progress
Restrictions Two-way signals
Description Construct new cycle way as per plans
Dates 09/01/2017 - 31/03/2017
Operator Lancashire County Council
Location From Stone Row Head To Moor Hospital Old Entrance

RoadnameRaikes Hill Drive
Work Status In Progress
Restrictions Stop / Go boards
Description Laying duct in f/w, c/w and building boxes
Dates 02/03/2017 - 29/03/2017
Operator Virgin Media
Location From The Jnct Of Sea View Drive

RoadnameRear 4-10 Furness Road
Work Status In Progress
Restrictions Road Closure
Description Immediate works to prevent unplanned interruption of service provided by uu - gang to dig down and repair sewer in alleyway to prevent foul flooding with permanent reinstatement
Dates 16/03/2017 - 30/03/2017
Operator United Utilities Water Limited
Location Rear Of 8 Furness Road

RoadnameRedmayne Drive
Work Status In Progress
Restrictions Multi-way signals
Description Traffic management purposes - working on north road
Dates 17/02/2017 - 02/03/2017
Operator Virgin Media
Location At The Junction Of Redmayne Drive

RoadnameRushley Drive
Work Status In Progress
Restrictions Multi-way signals
Description Laying duct int the f/w, c/w and builidng boxes
Dates 21/03/2017 - 10/04/2017
Operator Virgin Media
Location From The Junction Of Marine Drive To Outside Number 24

RoadnameSea View Drive
Work Status In Progress
Restrictions Stop / Go boards
Description Laying duct in the f/w, c/w and building boxes
Dates 10/03/2017 - 24/04/2017
Operator Virgin Media
Location From The Jnct Of Hesk Bank Lane To The Jnct Of Raikes Hill Drive

RoadnameSilverhill
Work Status In Progress
Restrictions Multi-way signals
Description Hornby - r6 - r-structure 355797 - overlay - lay approx 20m of duct 54/56 in carriageway to link existing bt boxes to facilitate spine cabling works.
Dates 20/03/2017 - 28/03/2017
Operator BT
Location From Opposite Church Bank Across Carriageway To Junction Of Eskrigge Lane On Silverhill

RoadnameSkipton Street
Work Status In Progress
Restrictions Road Closure
Description Construction of paved courtesy crossing over carriageway 07:30 - 21:00 monday - friday & 08:00 - 18:00 sunday
Dates 20/03/2017 - 31/03/2017
Operator Lancashire County Council
Location Carriageway For A Length Of 5M North From The Junction With Victoria S

RoadnameSpout Lane
Work Status In Progress
Restrictions Two-way signals
Description Immediate works to end unplanned interruption of supply provided by uu to repair leaking fire hydrant by machine digging in carriageway
Dates 23/03/2017 - 29/03/2017
Operator United Utilities Water Limited
Location Junction Of Spout Lane

RoadnameSt Johns Avenue
Work Status In Progress
Restrictions Multi-way signals
Description Silverdale - 357441 - traffic management - for traffic light heads only.
Dates 17/03/2017 - 28/03/2017
Operator BT
Location O/S 2A St Johns Avenue, Silverdale

RoadnameSt Leonards Gate
Work Status In Progress
Restrictions Two-way signals
Description Lay new domestic service 2m from main in footway
Dates 26/03/2017 - 28/03/2017
Operator National Grid Gas Plc
Location Outside 108 St Leonards Gate

RoadnameSt Margarets Road
Work Status In Progress
Restrictions Stop / Go boards
Description Installation of cabinets, swept tees, duct, chambers and subsequent installation of network cabling.
Dates 15/03/2017 - 27/03/2017
Operator Virgin Media
Location Junc With Marine Road East To Junc Clifford Ave And O/S No. 29 To O/S No. 7 St Margarets Road.

RoadnameStanley Street
Work Status About To Start
Restrictions Stop / Go boards
Description Laying duct in the f/w,c/w and building boxes
Dates 29/03/2017 - 05/05/2017
Operator Virgin Media
Location From The Junction Of Lancaster Road To Hill Street

RoadnameSulby Grove
Work Status In Progress
Restrictions Stop / Go boards
Description Installation of cabinets, swept tees, duct, chambers and subsequent installation of network cabling.
Dates 21/03/2017 - 29/03/2017
Operator Virgin Media
Location O/S No 2 To O/S No. 22 Sulby Grove& O/S No 1 To O/S No 21 Sulby Grove.

RoadnameSunningdale Avenue
Work Status In Progress
Restrictions Stop / Go boards
Description Laying duct in the f/w, c/w and building boxes
Dates 03/03/2017 - 06/04/2017
Operator Virgin Media
Location From The Junction Of Hest Bank

RoadnameSunnyfield Avenue
Work Status In Progress
Restrictions Stop / Go boards
Description Installation of cabinets, swept tees, duct, chambers and subsequent installation of network cabling.
Dates 13/03/2017 - 27/03/2017
Operator Virgin Media
Location Junc With Ruskin Drive To Junction With Mayfield Drive And O/S No. 33 To O/S 9 Sunnyfield Ave.

RoadnameTaylor Grove
Work Status In Progress
Restrictions Stop / Go boards
Description Installation of cabinets, swept tees, duct, chambers and subsequent installation of network cabling.
Dates 16/03/2017 - 28/03/2017
Operator Virgin Media
Location O/S No 2 To Junc With Chestnut Drive, O/S No 1 To O/S No. 17 Taylor Grove.

RoadnameThe Crescent
Work Status In Progress
Restrictions Multi-way signals
Description Laying duct in the f/w, c/w and building boxes
Dates 06/02/2017 - 10/03/2017
Operator Virgin Media
Location From The Jnct Of Costal Rd To Outside The Hest Bank Hotel

RoadnameThe Crescent
Work Status About To Start
Restrictions Two-way signals
Description Tree works.
Dates 30/03/2017 - 30/03/2017
Operator Lancashire County Council
Location The Crescent Between Station Road To Hesk Bank Lane

RoadnameThe Shore
Work Status About To Start
Restrictions Stop / Go boards
Description To allow access and egress of srs machine works to take place from 2200hrs on 01.04.17 to 1000hrs on 02.04.17 temporary stop/go boards stopping traffic for no more than 15 minutes each hour.
Dates 01/04/2017 - 02/04/2017
Operator Lancashire County Council
Location At Level Crossing At Junction With Coastal Road

RoadnameThe Shore
Work Status About To Start
Restrictions Multi-way signals
Description We require traffic management to enable a road rail vehicle& srs machine to access and egress at hest bank level crossing to deliver equipment. The times will be 22:00 sat 1st to 10:00 sun 2nd april 2017
Dates 01/04/2017 - 02/04/2017
Operator Network Rail -Promoters National
Location In The Area Of The Level Crossing

RoadnameTorrisholme Road
Work Status About To Start
Restrictions Two-way signals
Description Gang to replace manhole frame and cover in carriageway by minimum dig with permanent reinstatement
Dates 30/03/2017 - 30/03/2017
Operator United Utilities Water Limited
Location Outside Number 260 (Mh2202)

RoadnameTorrisholme Road
Work Status About To Start
Restrictions Two-way signals
Description Gang to replace manhole frame and cover in carriageway by minimum dig with permanent reinstatement
Dates 30/03/2017 - 30/03/2017
Operator United Utilities Water Limited
Location Outside 149 (Mh 1301)

RoadnameTowpath Walk
Work Status In Progress
Restrictions Stop / Go boards
Description Laying duct in the f/w,c/w and building boxes
Dates 24/03/2017 - 02/05/2017
Operator Virgin Media
Location From The Junction Of Alexandra Road

RoadnameWartonwood View
Work Status In Progress
Restrictions Stop / Go boards
Description Laying duct in the f/w, c/w and building boxes
Dates 21/03/2017 - 10/04/2017
Operator Virgin Media
Location From The Junction Of Hawes Hill To Outside 1 Wartonwood View

RoadnameWest Road
Work Status In Progress
Restrictions Two-way signals
Description Abandon 88m x 6" cast iron. Lay 88m x 215mm polyethylene insertion.allservices en route
Dates 07/03/2017 - 29/03/2017
Operator National Grid Gas Plc
Location Approx 38M From 29 West Road, 20M From 1 Storey Avenue To Rear Of 1 -6Castle Court.

RoadnameWest Road
Work Status In Progress
Restrictions Give and take
Description Abandon 10.1m x 8" cl.lay 10.1m x 63mm pe unknown. All services onroute.
Dates 16/03/2017 - 30/03/2017
Operator National Grid Gas Plc
Location Outside Scout Hut& Nursery To Outside 1-6.

RoadnameWhin Grove
Work Status In Progress
Restrictions Multi-way signals
Description 373844-carnforth-fault ref lc1rex21 lay duct 54/56 in to link existing bt boxes to facilitate spine cabling works. Customer out of service
Dates 18/02/2017 - 21/02/2017
Operator BT
Location Grass Area Whin Drive Bolton Le San Ds La5 8Dd

RoadnameWoodrush
Work Status In Progress
Restrictions Stop / Go boards
Description Installation of cabinets, swept tees, duct, chambers and subsequent installation of network cabling.
Dates 21/03/2017 - 10/04/2017
Operator Virgin Media
Location Junc With Chestnut Drive To O/S No 24 Woodrush. O/S No 25 To O/S 34 And O/S 38 To O/S 54 Woodrush.