Ribble Valley

Filters:

* (eg Temporary Traffic Lights, Lane Closures etc)
RoadnameAccrington Road
Work Status In Progress
Restrictions Multi-way signals
Description Slot cutting of traffic signal loops
Dates 02/08/2017 - 02/08/2017
Operator Lancashire County Council
Location Northbound On Approach To Junction With Burnley Road

RoadnameBranch Road
Work Status In Progress
Restrictions Two-way signals
Description Blackburn - 358352 - spine and bft - mellor spine sub duct and cabling. To rod rope and test, and install approx 120m of sub duct and cable and any associated blockages in existing in fw/cw/verge - spine route to exchange
Dates 18/08/2017 - 22/08/2017
Operator BT
Location From The Junction With Preston New Road To Approx 120M Nw On Branch Road

RoadnameBranch Road
Work Status In Progress
Restrictions Give and take
Description Alter and relay domestic service 15m from main in far side footway
Dates 21/08/2017 - 25/08/2017
Operator National Grid Gas Plc
Location Outside 103

RoadnameBurnley Road
Work Status About To Start
Restrictions Two-way signals
Description Two way signals to be used whilst overhead cable is replaced
Dates 23/08/2017 - 23/08/2017
Operator Electicity North West
Location Outside Little Middup

RoadnameChaigley Road
Work Status In Progress
Restrictions Give and take
Description Footway works
Dates 31/07/2017 - 29/09/2017
Operator Lancashire County Council
Location From Higher Road To Wheatley Drive

RoadnameChurch Raike
Work Status In Progress
Restrictions Multi-way signals
Description Ribbleton - 344036 - traffic management to facilitate bt openreach fibre cabling works - approx m with no excavation - for tl heads only
Dates 21/08/2017 - 23/08/2017
Operator BT
Location Junction With Garstang Road On Church Raike

RoadnameClitheroe Road
Work Status In Progress
Restrictions Road Closure
Description Surface dressing - the process should take 1 day but the process is affected by problems with weather and plant so a 1 month period is required.
Dates 22/06/2017 - 14/07/2017
Operator Lancashire County Council
Location Chatburn Old Road To Pimlico Link Road ( In Conjunction With Other Notices)

RoadnameClitheroe Road
Work Status In Progress
Restrictions Stop / Go boards
Description Drainage excavation to repair collapse at the side of the carriageway
Dates 16/08/2017 - 18/08/2017
Operator Lancashire County Council
Location 60M Down From The Entrance To Cemetery

RoadnameCross Hill Lane
Work Status About To Start
Restrictions Road Closure
Description Carriageway re-surfacing
Dates 23/08/2017 - 08/09/2017
Operator Lancashire County Council
Location Entire Length From Trash Lane To Hardacre Lane

RoadnameCrow Trees Brow
Work Status In Progress
Restrictions Road Closure
Description Surface dressing- the process shouild take 1 day but the process is affected by problems with weather and plant so a 1 month period is reqired.
Dates 22/06/2017 - 14/07/2017
Operator Lancashire County Council
Location Chatburn Old Road To Pimlico Link Road (Inconjunction With Other Notices)

RoadnameCrumpax Avenue
Work Status About To Start
Restrictions Multi-way signals
Description Longridge 394808 - traffic management for tl heads only
Dates 25/08/2017 - 30/08/2017
Operator BT
Location Junction With Inglewhite Road On Crumpax Avenue

RoadnameDilworth Lane
Work Status About To Start
Restrictions Stop / Go boards
Description Rectify interim to permanent reinstatement / defect
Dates 29/08/2017 - 31/08/2017
Operator ES Pipelines Ltd
Location Junction Croft Way

RoadnameDilworth Lane
Work Status About To Start
Restrictions Stop / Go boards
Description Rectify numerous defects in carriageway
Dates 29/08/2017 - 31/08/2017
Operator ES Pipelines Ltd
Location From Junction Of King Street To Junction Of Lower Lane

RoadnameDownham Road
Work Status In Progress
Restrictions Give and take
Description Immediate works to end unplanned interruption of supply provided by uu, to repair leaking stop tap by hand digging in footway
Dates 16/08/2017 - 22/08/2017
Operator United Utilities Water Limited
Location Outside 36

RoadnameGallows Lane
Work Status About To Start
Restrictions Give and take
Description Access required to underground bt structure to provide service - no structural changes. Work being carried out on existing bt plant
Dates 25/08/2017 - 25/08/2017
Operator BT
Location South Of Lower Dutton Cottage On Gallows Ln Preston Pr3 3Xu

RoadnameGarstang Road
Work Status In Progress
Restrictions Multi-way signals
Description Ribbleton - 344036 - desiliting - required on sections of duct in order to complete spine route to exchange area
Dates 21/08/2017 - 23/08/2017
Operator BT
Location From J/W Swinglehurst Lane To J/W Church Raike On Garstang Road

RoadnameGarstang Road
Work Status About To Start
Restrictions Two-way signals
Description Chipping 1 - dslam 407740, 407679, 407630 - blockages - excavate onto bt ducts for the clearance of duct blockages in to facilitate spine cabling works.
Dates 29/08/2017 - 11/09/2017
Operator BT
Location From O/S Black Hall To The Junc Of Broad Meadow On Garstang Road

RoadnameGreen Lane
Work Status In Progress
Restrictions Road Closure
Description Re-waterproofing bridge, then re-surfacing same bridge on green lane.
Dates 27/07/2017 - 28/07/2017
Operator Lancashire County Council
Location Bridge On Green Lane

RoadnameHollowhead Lane
Work Status In Progress
Restrictions Road Closure
Description Drainage works
Dates 12/06/2017 - 28/08/2017
Operator Lancashire County Council
Location Entire Length

RoadnameHorton Road
Work Status In Progress
Restrictions Road Closure
Description Re-waterproofing bridge on green lane, then re-surfacing same bridge.
Dates 27/07/2017 - 28/07/2017
Operator Lancashire County Council
Location Bridge On Green Lane

RoadnameInglewhite Road
Work Status About To Start
Restrictions Multi-way signals
Description Longridge 394808 - blockages - excavate onto bt ducts for the clearance of duct blockages in fw,cw to facilitate spine cabling works.
Dates 25/08/2017 - 30/08/2017
Operator BT
Location From O/S 15 To The Junction With Crumpax Avenue On Inglewhite Road

RoadnameJacksons Banks Road
Work Status In Progress
Restrictions Stop / Go boards
Description Carrying out trial holes and repairing the verges
Dates 14/08/2017 - 16/08/2017
Operator Lancashire County Council
Location Near Jacksons Banks Cottage.

RoadnameKing Street
Work Status In Progress
Restrictions Stop / Go boards
Description Carriageway re-surfacing
Dates 14/08/2017 - 08/09/2017
Operator Lancashire County Council
Location From Higher Road To Market Place

RoadnameKnot Lane
Work Status In Progress
Restrictions Road Closure
Description Re-waterproofing bridge on green lane, and re-surfacing same bridge.
Dates 27/07/2017 - 28/07/2017
Operator Lancashire County Council
Location Bridge On Green Lane

RoadnameKnowsley Road
Work Status In Progress
Restrictions Stop / Go boards
Description Lay speed humps
Dates 19/06/2017 - 23/06/2017
Operator Lancashire County Council
Location Various Locations Along The Length Of Knowsley Road

RoadnameLongridge Road
Work Status In Progress
Restrictions Two-way signals
Description Ribbleton - 344036 - gully sucking - required clean boxes and remove contaminated water in order to complete spine route to exchange area
Dates 21/08/2017 - 23/08/2017
Operator BT
Location From O/S 2 Longridge Road To O/W Brabins Endowed School On Longridge Road, Chipping, Preston Pr3 2Qd

RoadnameLongsight Road
Work Status In Progress
Restrictions Stop / Go boards
Description Replace pedestrian guard rail.
Dates 01/08/2017 - 01/08/2017
Operator Lancashire County Council
Location Out Side St Mery's School.

RoadnameLower Lane
Work Status In Progress
Restrictions Two-way signals
Description Install external water meter and boundary box at depth of under 1.5 metres with minimum dig with permanent reinstatement
Dates 22/08/2017 - 24/08/2017
Operator United Utilities Water Limited
Location In Service Strip Outside Number 47

RoadnameMarket Place
Work Status In Progress
Restrictions Stop / Go boards
Description Carriageway re-surfacing
Dates 14/08/2017 - 08/09/2017
Operator Lancashire County Council
Location From Fell Brow To King Street.

RoadnameMayfair Crescent
Work Status In Progress
Restrictions Give and take
Description Immediate works to end unplanned interruption of supply or service provided by uu. Open cut excavation required to repair leak on water service in footway
Dates 19/08/2017 - 25/08/2017
Operator United Utilities Water Limited
Location Outside Number 21

RoadnameMellor Brow
Work Status About To Start
Restrictions Two-way signals
Description Safe access required to underground bt structure to repair service - no structural changes. Work being carried out on existing bt plant
Dates 27/08/2017 - 27/08/2017
Operator BT
Location Opp 132 To Near Aintree Cottages Mellor Brow Mellor Bb2 7Pn

RoadnameMitton Road
Work Status In Progress
Restrictions Two-way signals
Description Lay new domestic service 13m from main in far side footway
Dates 13/07/2017 - 19/07/2017
Operator National Grid Gas Plc
Location Outside Plot Adjacent To 63 Mitton Road

RoadnameMyerscough Smithy Road
Work Status In Progress
Restrictions Two-way signals
Description Connect onto existing gas main in footway adjacent to the junction of myerscough smithy lane and lay 42.7m in footway, 17.7m in carriageway, 319.5m in footway and 9.5m in verge to the site entrance for the new thwaites brewery 2 way lights to be used to complete the road crossing all other times works will be in footway pedestrian access will be maintained and traffic flow unaffected.
Dates 21/08/2017 - 27/10/2017
Operator Fulcrum Pipelines Limited
Location From The Junction Of Myerscough Smithy Lane To The Entrance Of The New Thwaites Brewery

RoadnameOld Langho Road
Work Status In Progress
Restrictions Road Closure
Description Carriageway patching completion
Dates 01/07/2017 - 05/07/2017
Operator Lancashire County Council
Location Black Bull To Elker Lane

RoadnameOld Langho Road
Work Status In Progress
Restrictions Road Closure
Description Surface dressing- the process should take 1-2 days but the works are affected by problems with weather and plant so a 1 month period is required
Dates 12/07/2017 - 10/08/2017
Operator Lancashire County Council
Location Elker Lane To Northcote Road

RoadnamePadiham Road
Work Status In Progress
Restrictions Road Closure
Description Access required to underground bt structure to restore service - no digging to take place - highway surface will be unaffected. Work being carried out on existing bt plant.
Dates 21/08/2017 - 25/08/2017
Operator BT
Location Approx. 200 E From Jnc Padiham Road And Simonstone Road To A Further 200 E On Padiham Road Sabden Lancashire Bb7

RoadnamePendle Road
Work Status In Progress
Restrictions Lane closure
Description Construction of a new site entrance and roundabout for new housing development.
Dates 05/06/2017 - 01/09/2017
Operator Lancashire County Council
Location Approx 55M South East Of Rear Of Brett Close

RoadnamePendleton Road
Work Status About To Start
Restrictions Road Closure
Description Siting of crane to renew bt pole in private land
Dates 29/08/2017 - 30/08/2017
Operator BT
Location O/S Vicarage Fold, Pendleton Road

RoadnamePrimrose Road
Work Status About To Start
Restrictions Two-way signals
Description Abandon 25.2m x 2" pe. Lay 25.6m x 63mm pe open cut. All services onroute.
Dates 29/08/2017 - 11/09/2017
Operator National Grid Gas Plc
Location Junction Of Primrose Bridge - Opposite 5 Primrose Road

RoadnameSaccary Lane
Work Status In Progress
Restrictions Road Closure
Description Drainage investigation - also clear blocked culverts to ease and prevent flooding.
Dates 14/08/2017 - 18/08/2017
Operator Lancashire County Council
Location Saccary Lane Mellor

RoadnameSalesbury View
Work Status In Progress
Restrictions Give and take
Description Dig down and repair sinkhole
Dates 02/08/2017 - 03/08/2017
Operator Lancashire County Council
Location Jcn Whalley Rd

RoadnameShowley Road
Work Status In Progress
Restrictions Road Closure
Description Clear blocked culverts to stop future flooding and carry out an dditional drainage investigation.
Dates 14/08/2017 - 25/08/2017
Operator Lancashire County Council
Location Showley Road, Clayton-Le-Dale.

RoadnameShowley Road
Work Status In Progress
Restrictions Road Closure
Description Drainage investigation - also clear blocked culverts to ease and prevent more flooding.
Dates 14/08/2017 - 18/08/2017
Operator Lancashire County Council
Location Showley Road Clayton-Ledale, Ribble Valley.

RoadnameShowley Road
Work Status In Progress
Restrictions Road Closure
Description Immediate works to end unplanned interruption of supply provided by uu, to repair leaking main by machine digging in carriageway
Dates 17/08/2017 - 21/08/2017
Operator United Utilities Water Limited
Location Outside Oak Lea

RoadnameStopper Lane
Work Status In Progress
Restrictions Road Closure
Description Gisburn - 367469 - mole plough approx. 800m continuous duct/cable including core drills into existing chambers.
Dates 15/08/2017 - 29/08/2017
Operator BT
Location From Side Of Howcroft To The Junc Of Skeleron Lane On Stopper Lane

RoadnameStopper Lane
Work Status About To Start
Restrictions Road Closure
Description Carriageway re-surfacing
Dates 28/08/2017 - 08/09/2017
Operator Lancashire County Council
Location Entire Length

RoadnameTalbot Street
Work Status In Progress
Restrictions Multi-way signals
Description Ribbleton - 344036 - traffic management to facilitate bt openreach fibre cabling works - approx m with no excavation - for tl heads only
Dates 21/08/2017 - 23/08/2017
Operator BT
Location Junction With Talbot Street On Church Raike

RoadnameThe Dales
Work Status In Progress
Restrictions Give and take
Description Install new 25mm short sided water connection
Dates 15/08/2017 - 21/08/2017
Operator United Utilities Water Limited
Location Outside And Opposite 6

RoadnameTwiston Lane
Work Status In Progress
Restrictions Road Closure
Description Surface dressing - the process should take 2-3 days but the process is affected by problems with weather and plant so a 1 month period is required.
Dates 23/06/2017 - 14/07/2017
Operator Lancashire County Council
Location Pendle Road To Barley Lane ( In Conjunction With Other Notices )

RoadnameUp Brooks
Work Status In Progress
Restrictions Give and take
Description Immediate works to end unplanned interruption of supply provided by uu, to repair leaking main by hand and machine digging in footway and carriageway
Dates 18/08/2017 - 24/08/2017
Operator United Utilities Water Limited
Location Junction Off Lincoln Way

RoadnameWaddington Road
Work Status About To Start
Restrictions Two-way signals
Description 2 way lights with pedestrian barrier system to provide safe access to carriageway cabling chambers.
Dates 24/08/2017 - 25/08/2017
Operator BT
Location Waddington Road - From Laneside Farm To Where It Meets West Bradford Rd.

RoadnameWest Bradford Road
Work Status About To Start
Restrictions Two-way signals
Description 2 way lights with pedestrian barrier system to provide safe access to carriageway cabling chambers.
Dates 24/08/2017 - 25/08/2017
Operator BT
Location West Bradford Rd From It Meets Waddington Rd, Westwards For 40M Past Bridge

RoadnameWest Ing Lane
Work Status In Progress
Restrictions Road Closure
Description Re-waterproofing bridge, then re-surfacing on same bridge on green lane.
Dates 27/07/2017 - 28/07/2017
Operator Lancashire County Council
Location Bridge On Green Lane

RoadnameWhalley Clitheroe Bypass
Work Status In Progress
Restrictions Give and take
Description Repairing a footpath in a lay-bay
Dates 21/07/2017 - 21/07/2017
Operator Lancashire County Council
Location A59 Clitheroe By-Pass . At Layby 500Mtrs Ne Of Clitheroe Roundabout

RoadnameWhalley Road
Work Status In Progress
Restrictions Stop / Go boards
Description Surface dressing- the process should take 1-2 days but the process is affected by weather and plant problems so a1 month period is required.
Dates 13/06/2017 - 13/07/2017
Operator Lancashire County Council
Location Durham Road To York Lane ( In Conjunction With Other Notices )

RoadnameWhalley Road
Work Status In Progress
Restrictions Multi-way signals
Description Junction with neddy lane.installation of a gully on existing drainage line
Dates 05/07/2017 - 07/07/2017
Operator Lancashire County Council
Location Whalley Rd Jct Neddy Lane

RoadnameWheatsheaf Close
Work Status In Progress
Restrictions Two-way signals
Description Cut asphalt around two manhole covers - rebed and reinstate
Dates 27/06/2017 - 27/06/2017
Operator Lancashire County Council
Location Junction Clitheroe Road

RoadnameWindy Street
Work Status In Progress
Restrictions Two-way signals
Description Ribbleton - 344036 - gully sucking - required clean boxes and remove contaminated water in order to complete spine route to exchange area
Dates 21/08/2017 - 23/08/2017
Operator BT
Location O/S Old Vicarage, 12-14 Windy Street, Chipping, Preston Pr3 2Gd

RoadnameWoone Lane
Work Status In Progress
Restrictions Give and take
Description Immediate works to end unplanned interruption of supply or service provided by uu open cut excavation required to repair existing assets that is causing a potential hazard, on behalf of united utilities in carriageway
Dates 20/08/2017 - 25/08/2017
Operator United Utilities Water Limited
Location At Junction With Edward Drive

RoadnameYork Lane
Work Status About To Start
Restrictions Give and take
Description Immediate works to end unplanned interruption of supply provided by uu, to repair leaking main by hand and machine digging in footway and carriageway
Dates 23/08/2017 - 25/08/2017
Operator United Utilities Water Limited
Location Outside York Cliff